Heath Dorn

Providing critical capabilities to our warfighters requires navigating the intricate landscape of Federal Acquisition Regulation (FAR) requirements and Department of Defense (DoD) processes. These complexities often obscure delivery timelines and make it challenging to identify sources of delay. To stay ahead of peer adversaries, military programs must embrace tools and strategies that drive efficiency and align with mission-critical objectives.

DevOps Research and Assessment (DORA) metrics serve as a powerful tool, offering actionable insights into delivery cycle times, system reliability, and recovery speeds. These metrics empower government program managers, contracting officers, and prime contractors to pinpoint inefficiencies, minimize waste, and accelerate the delivery of critical capabilities to warfighters.


The Four DORA Metrics and Their Relevance to Military Programs

The four DORA metrics provide invaluable insights for military programs striving to enhance delivery efficiency and maintain mission readiness. These metrics are:

  1. Deployment Frequency (DF): Measures how often changes are delivered to production.
  2. Lead Time for Changes (LT): Tracks the time it takes to move from code committed to running in production.
  3. Change Failure Rate (CFR): Highlights the percentage of updates that result in production issues, emphasizing the need for robust testing and quality assurance to ensure mission-critical reliability.
  4. Mean Time to Restore (MTTR): Measures how quickly a system can recover from failures, a crucial factor in maintaining operational continuity in high-stakes environments. 

For military acquisition programs, leveraging these metrics can identify inefficiencies and improve system stability, offering insights into the ability to deliver rapidly, adapt to challenges, and align delivery timelines with urgent mission objectives, ensuring warfighters receive the capabilities they need without delay.

The four DORA metrics provide invaluable insights for military programs striving to enhance delivery efficiency and maintain mission readiness. 


Aligning Delivery to Mission Priorities

Many programs depend on rapid delivery to maintain a decisive edge over competitors. DORA metrics empower leaders to evaluate their teams’ ability to deliver quickly and reliably while identifying opportunities for automation and continuous improvement.

Mission-Driven Results:

A drone navigation system development program utilized Deployment Frequency (DF) to measure how often updates were delivered. By increasing the frequency of incremental releases, the team accelerated feature testing in operational environments, staying ahead of adversary advancements.

Gaining an Edge with Deployment Frequency:

Rapid delivery can be a game-changer. Deployment Frequency (DF) tracks how often updates are pushed to operational environments, enabling teams to iterate faster and improve continuously.

Scenario: A Materiel Leader overseeing a ground-based radar system program aimed to enhance DF to outpace adversary innovation. By adopting automated pipelines and feature toggles, the team achieved bi-weekly deployments, enabling swift capability enhancements and securing a tactical advantage.


Enhancing Cycle Time Visibility with Value Stream Mapping

Government program managers often struggle to track how long it takes for a requirement to navigate the acquisition lifecycle. By incorporating Lead Time for Changes (LT) as a DORA metric and leveraging value stream mapping, programs can uncover bottlenecks and streamline their workflows.

Case Study: A program developing a secure communication system utilized value stream mapping to trace a requirement’s journey from approval to deployment. The analysis revealed that testing and compliance reviews accounted for 70% of the total cycle time. By automating compliance checks and optimizing test environments, the program successfully reduced lead time from 90 days to just 30 days, dramatically accelerating delivery without sacrificing quality.


Monitoring System Performance and Recovery

Mission-critical systems demand exceptional reliability to ensure uninterrupted operations, particularly in high-stakes environments. Metrics such as Change Failure Rate (CFR) and Mean Time to Restore (MTTR) provide invaluable insights into how efficiently systems address defects and recover from disruptions, minimizing downtime and preserving mission readiness.

Real-World Application: A logistics software team responsible for supporting global troop movements encountered frequent crashes during peak operational periods, threatening mission continuity. By tracking MTTR, they identified manual recovery processes as the primary cause of prolonged downtime. Through the implementation of automated recovery workflows, the team reduced recovery times from six hours to just 45 minutes.

This improvement not only ensured uninterrupted mission support but also enhanced system resilience by enabling faster root cause analysis and quicker rollbacks for defective changes. Moreover, pairing MTTR with CFR allowed the team to focus on improving deployment quality, further reducing the likelihood of future crashes. These combined efforts contributed to a more robust and agile system, capable of adapting to operational demands without compromising reliability.


Integrating DORA Metrics into Government Contracts

Incorporating DORA metrics into award and incentive fee structures encourages contractors to prioritize delivery performance and quality.

Implementation Example:

A cybersecurity defense program structured incentives around the following metrics:

  • Deployment Frequency: Bonuses for achieving bi-weekly deployments.
  • Change Failure Rate: Rewards for maintaining CFR below 8%.
  • Mean Time to Restore: Penalties for exceeding a two-hour recovery window.

This approach aligned contractor priorities with mission objectives, ensuring efficient processes and high system reliability.


Binary Metrics: How DORA Translates to Actionable Insights

Deployment Frequency: Accelerating Incremental Deliveries

In a rapidly evolving environment, the need for agility in software delivery cannot be overstated. A Materiel Leader managing a ground-based radar system program faced a critical challenge: software updates were deployed only once every 90 days. This quarterly schedule was insufficient to keep pace with adversarial advancements, which demanded more frequent capability enhancements to maintain operational superiority.

To address this, the team set an ambitious target: transitioning from quarterly deployments to bi-weekly updates, effectively cutting the deployment cycle down to 14-day intervals. Achieving this goal required strategic changes to the development and deployment process. Automated build-and-deployment pipelines were introduced to streamline workflows and reduce manual effort. Additionally, feature toggles were implemented to decouple new features from lengthy testing cycles, allowing for incremental updates without compromising system stability.

These measures proved transformative. By reaching the desired deployment frequency, the program delivered radar system improvements every two weeks. This rapid iteration cycle enabled faster responses to evolving mission needs, ensuring the system remained ahead of adversarial threats. Through the application of DORA metrics, the program not only met its goals but also established a foundation for continuous delivery and operational excellence.

Lead Time for Changes: Reducing Bureaucratic Delays

Efficient delivery of software updates is essential for mission-critical systems, yet many programs face delays caused by bureaucratic inefficiencies. In one logistics software program, the lead time for changes stretched to an unsustainable 120 days. This extended timeline, driven by lengthy compliance reviews and manual handoffs, hindered the program’s ability to deliver timely updates critical to supporting troop movement planning.

The Materiel Leader recognized the need for a transformative approach and leveraged value stream mapping to identify bottlenecks in the process. Two primary inefficiencies emerged: the reliance on manual compliance checks and the lack of streamlined coordination among key stakeholders. Armed with this insight, the team established a clear target: reducing the lead time from 120 days to just 30 days.

To achieve this, compliance checks were automated using advanced CI/CD (Continuous Integration/Continuous Deployment) tools, significantly reducing the time required for validation. Simultaneously, a cross-functional Integrated Product Team (IPT) was formed to improve communication and expedite decision-making, ensuring smoother workflows and faster approvals.

These strategic actions yielded impressive results. The program surpassed its target, reducing the lead time to just 28 days. This improvement not only enabled quicker delivery of critical updates but also reinforced the program’s ability to adapt to evolving operational demands, ensuring the software remained a reliable asset for mission success.

Change Failure Rate: Enhancing System Stability

For mission-critical programs, stability is paramount. A weapons system software program was plagued by a high Change Failure Rate (CFR), with 20% of updates failing. Each failure not only disrupted operations but also necessitated costly and time-consuming rollbacks, delaying critical capability enhancements. This level of instability eroded confidence in the system and threatened its effectiveness in supporting operational needs.

Recognizing the urgency of the issue, the team set a clear objective: reduce the CFR to below 5%. Achieving this required a systematic approach to both identifying and addressing the root causes of failures. Automated regression testing was introduced as a first step, allowing the team to catch issues earlier in the development pipeline and ensure that new updates did not introduce unforeseen problems. Additionally, the team conducted comprehensive root cause analyses for every failure, using these insights to implement targeted improvements that prevented similar issues from recurring.

These efforts yielded significant results. By reducing the CFR to 4%, the program achieved a marked improvement in system reliability. This newfound stability not only accelerated the delivery of new features but also instilled greater confidence in the system’s ability to perform under mission-critical conditions. The shift from reactive fixes to proactive quality assurance ensured that the program could support its operational goals without compromise.

Mean Time to Restore: Ensuring Mission Continuity

In mission-critical systems, downtime can have severe consequences, particularly when real-time situational awareness is at stake. A Materiel Leader overseeing a satellite communications program faced a significant challenge: system outages were taking an average of six hours to resolve. These prolonged recovery times disrupted operations and compromised the program’s ability to support critical missions effectively.

Determined to address the issue, the team set an ambitious target to reduce the Mean Time to Restore (MTTR) from six hours to just 30 minutes. Achieving this goal required both technological and organizational improvements. Automated recovery scripts were developed to handle common outage scenarios, drastically reducing the time required to restore operations. Additionally, the program established a dedicated rapid-response team, trained specifically in incident management and equipped to act immediately when disruptions occurred.

The results were transformative. The program exceeded its goal, reducing MTTR to just 25 minutes. This improvement ensured near-continuous availability of the satellite communications system, enhancing mission readiness and enabling operators to maintain real-time awareness during critical operations. By pairing automation with specialized training, the program not only restored system stability but also created a framework for sustaining high performance under operational pressures.

Integrating DORA Metrics into Government Contracts

Materiel Leaders can drive contractor performance and improve mission outcomes by integrating DORA metrics directly into government contracts. By aligning award and incentive fees with measurable performance benchmarks, contracts can motivate contractors to prioritize speed, quality, and system reliability. This approach not only ensures accountability but also fosters innovation and efficiency in delivering critical capabilities.

For example, Deployment Frequency (DF) can serve as a key metric for incentivizing rapid and consistent software updates. A contract might reward contractors who achieve weekly or bi-weekly deployments, offering a 10% bonus on incentive fees when DF exceeds one deployment every 14 days. Similarly, Lead Time for Changes (LT) can be tied to awards, encouraging contractors to streamline their processes and deliver updates more quickly. Reducing LT below 30 days, for instance, could earn an additional 5% award fee.

Stability and reliability metrics such as Change Failure Rate (CFR) and Mean Time to Restore (MTTR) can further enhance contract performance. Contractors who maintain a CFR below 5% might qualify for a $50,000 bonus, reinforcing the importance of quality assurance and effective testing. Likewise, contracts can reward rapid recovery efforts by offering a $25,000 bonus per quarter for maintaining an MTTR under 30 minutes. On the flip side, penalties can be applied for exceeding agreed thresholds, ensuring that contractors remain focused on minimizing downtime.

By embedding DORA metrics into the fabric of government contracts, Materiel Leaders can create a performance-driven environment that balances innovation with operational excellence. This approach not only incentivizes contractors but also ensures that systems are delivered and maintained to meet the high demands of mission-critical operations.

Mission-Driven Results

Programs supporting real-time intelligence, battlefield awareness, or drone navigation systems benefit significantly from adopting DORA metrics. For example:

  • Reducing Lead Time: Automation reduced logistics software lead time from 120 days to 28 days.
  • Improving Stability: Regression testing lowered CFR from 20% to 4%.
  • Enhancing Recovery: Automated scripts reduced MTTR for satellite communication outages from six hours to 25 minutes.

Adopting DORA Metrics

The adoption of DORA metrics represents a transformative opportunity for military programs to improve operational effectiveness and deliver rapid, reliable capabilities. These metrics offer a clear path to:

Gain Visibility
Uncover inefficiencies and bottlenecks with tools like value stream mapping, enabling leaders to address process pain points and make informed decisions that streamline the delivery pipeline.

Enhance Efficiency
Leverage Deployment Frequency, Lead Time for Changes, Change Failure Rate, and Mean Time to Restore as actionable benchmarks to drive continuous improvement. These metrics provide the insights needed to refine workflows, reduce delays, and ensure high-quality deployments.

Incentivize Performance
Integrate DORA metrics into contract structures to align contractor incentives with mission objectives. Reward efficiency, quality, and reliability, fostering a results-driven culture that prioritizes timely and effective delivery of mission-critical systems.

Whether you are a program manager, contracting officer, or prime contractor, DORA metrics empower you to create an agile framework for delivering capabilities aligned with the ever-changing demands of modern missions. By adopting these tools, we can build a more efficient, effective acquisition process that ensures our warfighters have the tools they need to succeed. Together, let’s drive innovation, streamline operations, and maintain the edge required to secure mission success.


Ready to Begin?

  • Map your value streams to understand requirement flow.
  • Start tracking key DORA metrics.
  • Incorporate these metrics into contract performance incentives.
  • Contact Digital Transformations to see how we can help you.

By embracing these strategies, you can drive innovation, efficiency, and mission success in delivering critical capabilities to warfighters.

Founder & Transformation Coach

Licenses & Certificates

  • DevOps Institute Ambassador
  • Scaled Agile Certified Program Consultant 
  • Jenkins Continuous Integration Open-Source Project
>